Project guideUsually permitted

Windows & doors in Westminster: Planning Permission Guide

A guide to replacing windows and doors in Westminster — when you need planning permission and typical costs.

84%
approved in Westminster
£548
application fee
8 wks
typical decision
Usually permitted

Based on 333 decided applications in Westminster over 12 months (279 granted, 54 refused).

The City of Westminster has the densest concentration of conservation areas and listed buildings in the UK, covering almost the entire borough. Article 4 Directions layer on top of this in many areas, restricting virtually any external alteration. Listed building consent is required frequently in addition to planning permission. The council's design expectations are among the most stringent in the country — professional planning advice is essential.

Council planning portalPre-application advice

Will yours qualify?

Free 2-minute check for your Westminster address.

Run my free check

Recent windows & doors decisions in Westminster

The 5 most recent decided applications. Addresses redacted to postcode area.

Granted

Details of samples of facing materials including glazing and elevations and roof plans annotated to show where the materials are to be lo…

W1W2026-08-27
Granted

Details of amended design of carriage doors to the left-hand ground-floor opening; sash window with sidelights and infill beneath, to the…

W1U2026-08-27
Granted

Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of listed building consent dated 27th Jul…

W1S2026-08-27
Granted

Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of planning permission dated 27th July 20…

W1S2026-08-27
Granted

Replacement of lower ground floor side door. (Linked with 26/04784/LBC)

W92026-08-27

These are borough-wide. See the 5 nearest to your address.

Check your address free

Permitted Development Rules

Replacing or adding windows/doors may need planning permission in conservation areas or for listed buildings.

Replacing windows and doors like-for-like generally doesn't need planning permission. However, in conservation areas or listed buildings, changes to the appearance of windows and doors may require consent.

Typical Costs in London

Window and door costs depend on the number of openings, material choice, and style.

Windows & doorsLondon

Typical total

£3,000£15,000

Typically includes

Windows/doorsInstallationMaking good

Typically excludes

Planning application feeBuilding regs fee

Highly variable depending on number of windows, material (UPVC vs timber vs aluminium), and style. Per-window costs typically £500–£1,500.

Get a personalised cost estimate based on your actual windows & doors dimensions.

Get my estimate

Which Professionals Do You Need?

Window replacements rarely need professional services. Suppliers typically handle measurement, manufacture, and installation.

This project is unlikely to need specialist professional services beyond a competent builder.

Architect / designerNot needed

This type of project does not typically require architectural services.

Structural engineerNot needed
Party wall surveyorNot needed
Planning consultantNot needed

This guidance is based on a typical semi-detached house with no special constraints. Listed buildings, conservation areas, and attached properties may require additional professional input.

Find out exactly which professionals you need for your windows & doors.

Get personalised guidance

Conservation Areas & Listed Buildings

In conservation areas, changing window materials (e.g. timber to UPVC) or styles may need planning permission. Listed buildings always need Listed Building Consent for any window or door changes.

Conservation areas

Properties in conservation areas often have reduced permitted development rights. Some project types (like side extensions) lose PD rights entirely. An Article 4 Direction can remove additional PD rights.

Listed buildings

Listed buildings (Grade I, II*, or II) have no permitted development rights at all. Any external alteration requires Listed Building Consent in addition to any planning permission. An architect experienced in heritage work is essential.

Check if your property is in a conservation area or has other planning constraints.

Check my property

Frequently Asked Questions

Just want a quick yes/no for your windows & doors?

Run our free 2-minute check to see whether your project likely qualifies as permitted development in Westminster — your address, your constraints, your council's own recent decisions.

Free 2-min check