Fence, wall or gate in Westminster: Planning Permission Guide
Your guide to fences, walls, and gates in Westminster — height limits, permitted development rules, and costs.
Based on 111 decided applications in Westminster over 12 months (93 granted, 18 refused).
The City of Westminster has the densest concentration of conservation areas and listed buildings in the UK, covering almost the entire borough. Article 4 Directions layer on top of this in many areas, restricting virtually any external alteration. Listed building consent is required frequently in addition to planning permission. The council's design expectations are among the most stringent in the country — professional planning advice is essential.
Recent fence, wall or gate decisions in Westminster
The 5 most recent decided applications. Addresses redacted to postcode area.
Installation of an externally illuminated hanging sign measuring 1.06m x 0.66m attached to the gate pillar on Bell Yard.
Details of supplementary acoustic report, revised boundary treatment and new windows and doors pursuant to conditions 5, 10 and 24 of pla…
Details of revised boundary treatment and method statement for dismantling and reconstruction of cantilevered stone staircase, balustrade…
Display of an externally illuminated hanging sign measuring 1.06m x 0.66m attached to the gate pillar on Bell Yard.
Installation of combined defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch.
These are borough-wide. See the 5 nearest to your address.
Check your address freePermitted Development Rules
Gates, fences, walls or other means of enclosure
GPDO 2015, Schedule 2, Part 2, Class A
Fences, walls, and gates are covered by Part 2, Class A of the GPDO. The main consideration is height: up to 1 metre next to a highway, up to 2 metres elsewhere.
Key dimension limits
These are the maximum GPDO limits for a detached house with no constraints. Your actual limits depend on your property type, location, and any planning restrictions.
Enter your postcode to see the personalised limits for your fence, wall or gate.
Check my limitsTypical Costs in London
Boundary treatment costs depend on the length, material, and type — timber fencing is cheapest, brick walls are the most expensive.
Typical total
Typically includes
Typically excludes
Timber fencing is cheapest. Brick walls and metal railings cost significantly more per metre.
Get a personalised cost estimate based on your actual fence, wall or gate dimensions.
Get my estimateWhich Professionals Do You Need?
Boundary treatments rarely need professional services beyond a competent builder or fencing contractor.
This project is unlikely to need specialist professional services beyond a competent builder.
This type of project does not typically require architectural services.
This guidance is based on a typical semi-detached house with no special constraints. Listed buildings, conservation areas, and attached properties may require additional professional input.
Find out exactly which professionals you need for your fence, wall or gate.
Get personalised guidanceConservation Areas & Listed Buildings
In conservation areas, the same height rules apply, but you should consider materials that are sympathetic to the area character. Some Article 4 Directions restrict boundary treatments.
Properties in conservation areas often have reduced permitted development rights. Some project types (like side extensions) lose PD rights entirely. An Article 4 Direction can remove additional PD rights.
Listed buildings (Grade I, II*, or II) have no permitted development rights at all. Any external alteration requires Listed Building Consent in addition to any planning permission. An architect experienced in heritage work is essential.
Check if your property is in a conservation area or has other planning constraints.
Check my propertyFrequently Asked Questions
Just want a quick yes/no for your fence, wall or gate?
Run our free 2-minute check to see whether your project likely qualifies as permitted development in Westminster — your address, your constraints, your council's own recent decisions.
Free 2-min check