Fence, wall or gate in Redbridge: Planning Permission Guide
Your guide to fences, walls, and gates in Redbridge — height limits, permitted development rules, and costs.
Based on 27 decided applications in Redbridge over 12 months (20 granted, 7 refused).
Redbridge has conservation areas around Wanstead, Woodford Green, and Chigwell Row. The borough borders Epping Forest (a special designated area with strict controls near the boundary) and Green Belt extends across the north-east fringes. Listed buildings are concentrated around Wanstead Park and Woodford High Road. Flood zones apply along the Roding. Much of the housing is inter-war semi-detached with reasonable PD flexibility on unconstrained plots.
Recent fence, wall or gate decisions in Redbridge
The 5 most recent decided applications. Addresses redacted to postcode area.
T5 (Oak) - Raise low canopy over parking spaces to 4m; T15 (Ash Raywood) - reduce by 2m; T18, T19 (Ash) - raise by 4m; T24 (Cherry) - …
Installation of external wall insulation with render finish and associated works. (summary)
Remove existing cladding. Installation of external wall insulation with render finish and associated works. Replacement windows. (summary)
Installation of extraction system and duct work to the side of building concealed behind new timber fencing/gate to the top of existing b…
TPO 121/11 - T2 (Hornbeam (dead)) – Fell to near ground level. T6 (Cherry) – Reduce height by 1m and bring in side growth by 0.5m. T9 (…
These are borough-wide. See the 5 nearest to your address.
Check your address freePermitted Development Rules
Gates, fences, walls or other means of enclosure
GPDO 2015, Schedule 2, Part 2, Class A
Fences, walls, and gates are covered by Part 2, Class A of the GPDO. The main consideration is height: up to 1 metre next to a highway, up to 2 metres elsewhere.
Key dimension limits
These are the maximum GPDO limits for a detached house with no constraints. Your actual limits depend on your property type, location, and any planning restrictions.
Enter your postcode to see the personalised limits for your fence, wall or gate.
Check my limitsTypical Costs in London
Boundary treatment costs depend on the length, material, and type — timber fencing is cheapest, brick walls are the most expensive.
Typical total
Typically includes
Typically excludes
Timber fencing is cheapest. Brick walls and metal railings cost significantly more per metre.
Get a personalised cost estimate based on your actual fence, wall or gate dimensions.
Get my estimateWhich Professionals Do You Need?
Boundary treatments rarely need professional services beyond a competent builder or fencing contractor.
This project is unlikely to need specialist professional services beyond a competent builder.
This type of project does not typically require architectural services.
This guidance is based on a typical semi-detached house with no special constraints. Listed buildings, conservation areas, and attached properties may require additional professional input.
Find out exactly which professionals you need for your fence, wall or gate.
Get personalised guidanceConservation Areas & Listed Buildings
In conservation areas, the same height rules apply, but you should consider materials that are sympathetic to the area character. Some Article 4 Directions restrict boundary treatments.
Properties in conservation areas often have reduced permitted development rights. Some project types (like side extensions) lose PD rights entirely. An Article 4 Direction can remove additional PD rights.
Listed buildings (Grade I, II*, or II) have no permitted development rights at all. Any external alteration requires Listed Building Consent in addition to any planning permission. An architect experienced in heritage work is essential.
Check if your property is in a conservation area or has other planning constraints.
Check my propertyFrequently Asked Questions
Just want a quick yes/no for your fence, wall or gate?
Run our free 2-minute check to see whether your project likely qualifies as permitted development in Redbridge — your address, your constraints, your council's own recent decisions.
Free 2-min check