Project guideGPDO Class A (Part 2)

Fence, wall or gate in Cheltenham: Planning Permission Guide

Your guide to fences, walls, and gates in Cheltenham — height limits, permitted development rules, and costs.

81%
approved in Cheltenham
£548
application fee
8 wks
typical decision
1–2m
PD height

Based on 21 decided applications in Cheltenham over 24 months (17 granted, 4 refused).

Cheltenham has 7 conservation areas, but they cover much of the Regency town centre — so a large share of central properties face external-alteration controls. Around 1,140 listed buildings are recorded, with Green Belt land around parts of the town. It is not within any AONB or National Park.

Council planning portal

Will yours qualify?

Free 2-minute check for your Cheltenham address.

Run my free check

Recent fence, wall or gate decisions in Cheltenham

The 5 most recent decided applications. Addresses redacted to postcode area.

Granted

Construction of new fence, rear access gate, rear patio and ancillary landscape works.

GL512026-10-30
Granted

Reclaimed red brick piers x2 with wooden gates to be built at the rear of the property to replace faulty wall/gate.

GL502026-10-20
Granted

To reconstruct part of the rear boundary wall between numbers 4 and 6 Park Place.

GL502026-10-16
Granted

Variation of Condition 2 (approved drawings) of planning permission 25/01750/FUL - approval sought for change of external wall finish to …

GL532026-10-09
Granted

The replacement of a section of boundary wall and installation of new access gates and siting of garden store.

GL502026-09-18

These are borough-wide. See the 5 nearest to your address.

Check your address free

Permitted Development Rules

Class A (Part 2)Part 2

Gates, fences, walls or other means of enclosure

GPDO 2015, Schedule 2, Part 2, Class A

Fences, walls, and gates are covered by Part 2, Class A of the GPDO. The main consideration is height: up to 1 metre next to a highway, up to 2 metres elsewhere.

Key dimension limits

Max 1m adjacent to highwayMax 2m elsewhere

These are the maximum GPDO limits for a detached house with no constraints. Your actual limits depend on your property type, location, and any planning restrictions.

Enter your postcode to see the personalised limits for your fence, wall or gate.

Check my limits

Typical Costs in South West England

Boundary treatment costs depend on the length, material, and type — timber fencing is cheapest, brick walls are the most expensive.

Fence, wall or gateSouth West England

Typical total

£900–£4,500

Typically includes

MaterialsInstallationFoundations (for walls)

Typically excludes

Planning application fee

Timber fencing is cheapest. Brick walls and metal railings cost significantly more per metre.

Get a personalised cost estimate based on your actual fence, wall or gate dimensions.

Get my estimate

Which Professionals Do You Need?

Boundary treatments rarely need professional services beyond a competent builder or fencing contractor.

This project is unlikely to need specialist professional services beyond a competent builder.

Architect / designerNot needed

This type of project does not typically require architectural services.

Structural engineerNot needed
Party wall surveyorNot needed
Planning consultantNot needed

This guidance is based on a typical semi-detached house with no special constraints. Listed buildings, conservation areas, and attached properties may require additional professional input.

Find out exactly which professionals you need for your fence, wall or gate.

Get personalised guidance

Conservation Areas & Listed Buildings

In conservation areas, the same height rules apply, but you should consider materials that are sympathetic to the area character. Some Article 4 Directions restrict boundary treatments.

Conservation areas

Properties in conservation areas often have reduced permitted development rights. Some project types (like side extensions) lose PD rights entirely. An Article 4 Direction can remove additional PD rights.

Listed buildings

Listed buildings (Grade I, II*, or II) have no permitted development rights at all. Any external alteration requires Listed Building Consent in addition to any planning permission. An architect experienced in heritage work is essential.

Check if your property is in a conservation area or has other planning constraints.

Check my property

Frequently Asked Questions

Just want a quick yes/no for your fence, wall or gate?

Run our free 2-minute check to see whether your project likely qualifies as permitted development in Cheltenham — your address, your constraints, your council's own recent decisions.

Free 2-min check