Fence, wall or gate in Blackpool: Planning Permission Guide

Your guide to fences, walls, and gates in Blackpool — height limits, permitted development rules, and costs.

Check if your fence, wall or gate qualifies

Fence, wall or gates in Blackpool at a glance

78%

approved

8

weeks typical

Based on 36 decided applications in Blackpool over 12 months (28 granted, 8 refused).

Blackpool has conservation areas around North Shore, Stanley Park, and parts of South Shore. Listed buildings cluster around the Tower, the three piers, and around Blackpool Grammar School. The Fylde Coast flood zone covers extensive coastal areas, affecting outbuilding classes near the seafront. The borough is predominantly Victorian and Edwardian terraced and small-scale guesthouse/hotel stock, with later inter-war suburban extension. Heritage considerations weigh heavily around the seafront.

Want your personalised odds?

Approval probability, 5 nearest comparables, refusal reasons — for your specific address.

Recent fence, wall or gate decisions in Blackpool

The 5 most recent decided applications. Addresses redacted to postcode area.

Withdrawn

Use of part of side gable wall for advertising of a commercial product and/or business in the for...

FY12026-03-25
Granted

Erection of 2.4m high paladin security fencing along north eastern boundary.

FY12026-03-12
Actioned

Reduction of 1.5m of conifer hedge on rear boundary, 2m reduction and removal of deadwood from As...

FY32026-02-26
Granted

Alterations to front boundary wall and use of premises as drinking establishment.

FY22026-01-27
Granted

Part removal of front wall to allow widening of access

FY42026-01-19

These are borough-wide. See the 5 nearest to your address.

Get my report — £9

Permitted Development Rules

Class A (Part 2)Part 2

Gates, fences, walls or other means of enclosure

GPDO 2015, Schedule 2, Part 2, Class A

Fences, walls, and gates are covered by Part 2, Class A of the GPDO. The main consideration is height: up to 1 metre next to a highway, up to 2 metres elsewhere.

Key dimension limits

Max 1m adjacent to highwayMax 2m elsewhere

These are the maximum GPDO limits for a detached house with no constraints. Your actual limits depend on your property type, location, and any planning restrictions.

Enter your postcode to see the personalised limits for your fence, wall or gate.

Check my limits

Typical Costs in North West England

Boundary treatment costs depend on the length, material, and type — timber fencing is cheapest, brick walls are the most expensive.

Fence, wall or gateNorth West England

Typical total

£700£3,500

Typically includes

MaterialsInstallationFoundations (for walls)

Typically excludes

Planning application fee

Timber fencing is cheapest. Brick walls and metal railings cost significantly more per metre.

Get a personalised cost estimate based on your actual fence, wall or gate dimensions.

Get my estimate

Which Professionals Do You Need?

Boundary treatments rarely need professional services beyond a competent builder or fencing contractor.

This project is unlikely to need specialist professional services beyond a competent builder.

Architect / designerNot needed

This type of project does not typically require architectural services.

Structural engineerNot needed
Party wall surveyorNot needed
Planning consultantNot needed

This guidance is based on a typical semi-detached house with no special constraints. Listed buildings, conservation areas, and attached properties may require additional professional input.

Find out exactly which professionals you need for your fence, wall or gate.

Get personalised guidance

Conservation Areas & Listed Buildings

In conservation areas, the same height rules apply, but you should consider materials that are sympathetic to the area character. Some Article 4 Directions restrict boundary treatments.

Conservation areas

Properties in conservation areas often have reduced permitted development rights. Some project types (like side extensions) lose PD rights entirely. An Article 4 Direction can remove additional PD rights.

Listed buildings

Listed buildings (Grade I, II*, or II) have no permitted development rights at all. Any external alteration requires Listed Building Consent in addition to any planning permission. An architect experienced in heritage work is essential.

Check if your property is in a conservation area or has other planning constraints.

Check my property

Frequently Asked Questions

Just want a quick yes/no for your fence, wall or gate?

Run our free 2-minute check to see whether your project likely qualifies as permitted development in Blackpool. For personalised approval odds and nearby comparables, get the full report above.

Free 2-min check